LESCO schedules up to 5-hour Lahore outages on Nov 18
LESCO has announced planned electricity shutdowns across Lahore and nearby districts on 18 November 2026, with outages ranging from three to five hours. Dozens of grids and feeders are affected, covering residential neighbourhoods, industrial zones, and peripheral towns along major arterial roads.
LESCO (Lahore Electric Supply Company) has announced planned electricity shutdowns across multiple areas of Lahore and nearby districts on Tuesday, 18 November 2026, with outages lasting between three and six hours depending on the grid station and feeder involved.
Shutdown Timings and Affected Grids
The shortest outage on the schedule affects Iqbal Town Grid's Johar Town 2 feeders, where power will be suspended from 9:00 am to 12:00 pm — a three-hour window. The majority of listed grids and feeders will face a longer cut from 9:00 am to 2:00 pm, totalling five hours. A separate shutdown is scheduled at Jandiala Sher Khan Grid from 10:00 am to 3:00 pm, also a five-hour interruption.
The grids and feeders confirmed for the 9:00 am–2:00 pm window include:
- Ali Razaabad, Bathana, Aisha Fayyaz, Moulding, Kot Lakhpat, Yousaf Colony
- Faisal Spinning, F-8, Fazal Colony, Allahabad, Ramgarh, Hujra Shah Muqeem
- Kot Hashim, Al-Jude Steel, Mozang, Manawala, Narang, Asia Poultry, Walton
- New Raiwind Old Grid and associated feeders
Neighbourhoods and Districts Affected
The shutdown notice covers a wide spread of Lahore's residential, commercial, and industrial zones. Neighbourhoods explicitly named include Model Town, Township, Sabzazar, Johar Town, Gulshan-e-Iqbal, Daroghwala, Press Club area, Syedpur, and Old Kot Lakhpat. Peripheral localities along Ferozepur Road, Multan Road, Sheikhupura Road, and Raiwind Road are also listed, as are the towns of Manga, Khedian, Batappur, and Chak 65 in nearby districts. Industrial users — including steel, textile spinning, and poultry operations — are among the affected categories.
Source: Pakistan Observer
Frequently Asked
Questions about this story
How long will the LESCO power shutdown last in Lahore on 18 November 2026?
Most affected grids and feeders will experience a five-hour outage from 9:00 am to 2:00 pm. Iqbal Town Grid's Johar Town 2 feeders face a shorter three-hour cut from 9:00 am to 12:00 pm, while Jandiala Sher Khan Grid is shut from 10:00 am to 3:00 pm.Which Lahore neighbourhoods are affected by the LESCO shutdown on November 18?
Named areas include Model Town, Township, Sabzazar, Johar Town, Gulshan-e-Iqbal, Daroghwala, Kot Lakhpat, Mozang, and localities along Ferozepur Road, Multan Road, Sheikhupura Road, and Raiwind Road, among others.Is the 18 November LESCO outage a planned maintenance shutdown or unscheduled load shedding?
LESCO issued a formal advance shutdown notice listing specific grid stations, feeders, and timed windows, indicating this is a scheduled maintenance or infrastructure work outage rather than demand-driven load shedding.



