Pakistan installed power capacity (updated 23 Nov 2026)
Pakistan's installed electricity generation capacity from the official sources, the Economic Survey and NEPRA's State of Industry Report, by source, with why the published totals differ.
Last updated:
By the PowerPost editorial team
PowerPost capacity tracker (updated 23 Nov 2026):Pakistan's installed capacity was 49,651 MW in July–March FY2026, including 7,319 MW from net metering (Economic Survey 2025-26).
NEPRA's State of Industry Report 2025 gives 41,121 MW as on 30 June 2025, including K-Electric.
Why the figures differ: they count different things on different dates. The Economic Survey includes net-metered rooftop solar; NEPRA counts the plants supplying the national grid and K-Electric on 30 June 2025; and the 44,626 MW in our June report was a projection for end-June 2026 reported by Engineering Post, not an official figure.
Economic Survey 2025-26: capacity by source
| Source | FY2025 (MW) | July–March FY2026, provisional (MW) |
|---|---|---|
| Hydel | 11,561 | 11,615 |
| Thermal | 27,507 | 24,405 |
| Nuclear | 3,530 | 3,530 |
| Renewable | 2,782 | 10,101 (includes 7,319 from net metering) |
| Total | 45,380 | 49,651 |
From Table 14.1 of the Economic Survey's energy chapter, which cites HDIP, PPIB and the Pakistan Atomic Energy Commission. The Survey also says 13 IPPs with 5,105 MW of combined capacity have closed.
NEPRA State of Industry Report 2025: by system
| System | 30 June 2024 (MW) | 30 June 2025 (MW) |
|---|---|---|
| CPPA-G system (the national grid outside Karachi) | 42,512 | 38,431 |
| K-Electric system (Karachi) | 3,376 | 2,690 |
| Pakistan total | 45,888 | 41,121 |
From section 3.2 of NEPRA's State of Industry Report 2025. National Grid (NTDC) data is not included: its website did not allow our automated access when this page was checked.
Sources
- Pakistan Economic Survey 2025-26, chapter 14 (Energy), Finance Division — Table 14.1, installed capacity by source, FY2025 and July–March FY2026 (provisional)
- NEPRA State of Industry Report 2025 — section 3.2, installed capacity in the country as on 30 June 2024 and 30 June 2025